Inventory updates when a board leaves the line — not after stocktaking.
96%
Edge classification. No operator at the stack. OPC-UA, MQTT, REST.
Per board
Traceability from raw material to client — history for every piece.
Zero floor change
Sensors record production. People keep working as before.
From every machine.
See. Record. Manage.
Cutting controllers and settings — live view, history, and control from one production-line panel.
2027 solution · vote
Vote for one thesis
Click one section: controllers, digital board trail, or grain analysis. Email below. Voting is voluntary.
Your pick
01 · Machines
Controllers cut — and measure.
Blade speed, feed, edging width: every cutting setting is a live signal stream. Arbor gathers mass data on each board as it is made — not after stocktaking.
Program parameters visible from the line panel
Cut geometry and tempo per piece
Edge + cloud: detection under 500 ms
PT-01
28.0 m/sposuw 9.6edge sync
Your pick
02 · Board registry
A digital trail for every board.
The board registry binds sensors and controllers into a piece card: dimensions, grade, raw batch, line history. Not eyeball inventory — a digital service around every board.
Traceability from log to client
Inventory updates in 13–48 s
Piece history, not only batch history
ID
22×150C24trace ✓
Your pick
03 · Grain analysis
Grain analysis.
A fibre and defect map on every board — not just size. Grain becomes data: for visual matching, grade, and project fit, without hand sorting by eye.
We merge Tier 1 and Tier 2 into one capital band (€200k–€1.2M) for 10–18 mills. The middle band is skipped. Second section: €5M–€22M — Europe with expansion lines.
Scale A · Seed + growth
€200k – €1.2M
10–18 pilot mills
One band instead of two separate tiers: prove product-market fit in Poland and first installs in nearby CEE — without bloating the team.
Installs (target)10–18
ARR at period end€80k – €1.0M
GeographyPL → CZ / SK / Baltics
Team4–14 people
Map · reach A
PLCZSKLTLVEE
Scale B · Pan-European
€5M – €22M
CEE · Nordics · DACH expansion
We skip the middle band. This range opens the category in Europe: expansion lines from the CEE hub into Nordics and DACH, ready for OEM partnerships.
Installs (target)2 500–6 000
ARR at period end€18M – €42M
GeographyEuropa + entry NA
Team90–180 people
Map · reach B
PLDESEFINOATROFR
TAM Europa
€335M
45 000 tartaków × €7 440/rok
Scale A — SOM
10–18
mills at €200k–€1.2M
Scale B — goal
€18–42M ARR
at €5–22M
Arbor — first contact
For investors
Leave your details — we will follow up with materials and a suggested time to talk.
Early access list
We will notify you when we open more pilot slots or share a demo.